Here’s a checklist for the permit process based on the Laurel County Health Department’s guidelines for septic system installation:

Picture is for visual illustration only

Septic System Installation Permit Checklist for Laurel County, KY

  1. Installing a septic system in Laurel County, KY requires following specific steps to obtain the necessary permits. Whether you’re building a new home, mobile home site, or commercial property, this guide will help you navigate the permitting process efficiently.

    Step 1: Choose Your Building Site

    Select a suitable location for your home or business before applying for a septic system permit. The site must have enough space for the system and meet local health department regulations.

    Step 2: Obtain a Site Evaluation Application

    Visit the Laurel County Health Center to get the Onsite Sewage Disposal Systems Application (form DFS-319). This application is required before a site evaluation can be conducted.

    Step 3: Complete the Application

    Fill out the form with essential details, including:

    • The number of bedrooms for residential properties
    • The type of business for commercial properties
    • The number and type of plumbing fixtures

    Step 4: Pay the Evaluation Fee

    Submit a $240.00 evaluation fee to the Laurel County Health Department (payable by check or money order). This fee covers the cost of the site inspection.

    Step 5: Prepare for a Site Inspection

    • Arrange for backhoe pits or another excavation method.
    • Coordinate with the Health Department to schedule an inspection.

    Step 6: Site Evaluation Process

    A Health Department official will inspect the site to ensure it meets septic system requirements. The land must not be disturbed by grading, heavy machinery, or construction activities before the evaluation.

    Step 7: Receive Your Site Evaluation Report

    If the site meets the required criteria, you will receive a site evaluation report, allowing you to move forward with the septic system installation.

    Step 8: Request an Installation Permit

    Once your site is approved, submit a request for the septic system installation permit. After approval, you can begin the installation process.

    Step 9: Schedule a Final Inspection

    Before covering the system, the installer must schedule a final inspection with the Health Department. The system must be installed according to approved permit specifications.

    Step 10: Obtain Final Approval

    After passing the final inspection, the Health Department will issue final approval. This approval is necessary before obtaining permanent electrical hookups for your property.

    Final Thoughts

    By following this checklist and maintaining communication with the Laurel County Health Department, you can ensure a smooth and compliant septic system installation process.

    For more details, visit the Laurel County Permit Page.

Contact Us Today

Read More Septic Blog Posts